Whittier ADU Construction
A custom 800-square-foot Accessory Dwelling Unit with additional storage and a pool house restroom, completed through thoughtful planning and practical construction solutions.
Project Overview

The Whittier project involved the construction of an approximately 800-square-foot Accessory Dwelling Unit on an existing residential property. In addition to the ADU, CoreFrame Builders constructed an attached storage room and added a restroom to serve the property's existing pool house.
The project required careful coordination with existing site conditions, particularly the property's plumbing infrastructure. Through practical problem-solving and organized construction management, the team developed solutions that allowed the project to move forward while avoiding unnecessary work and additional costs for the homeowner.
Project Goals
The primary goal was to expand the property's usable space through a new ADU while adding supporting amenities that improved the functionality of the overall residence. The new storage room provided additional utility space, while the pool house restroom created greater convenience for the homeowners and their outdoor living area.
Another important priority was finding a practical way to integrate the new construction with the property's existing infrastructure. CoreFrame Builders evaluated the conditions encountered during construction and identified an alternative plumbing solution that helped avoid a significantly more extensive and costly replacement.
Scope of Work

CoreFrame Builders managed the project through careful planning, coordination, and execution.
Project highlights included:
- Approximately 800-square-foot ADU construction
- Attached storage room construction
- Pool house restroom addition
- Plumbing system coordination
- Existing plumbing pipe evaluation
- Existing pipe sleeving solution
- Construction drawing revisions
- Inspection coordination
- Interior construction and finishing
- Final project completion
Each phase required close coordination between the new construction, existing property infrastructure, and ongoing inspection requirements.
Construction Challenge
One of the primary challenges involved the property's existing plumbing connections. The location and condition of the plumbing connections leading toward the street were initially unknown, and portions of the existing piping were found to be damaged. Completely replacing the plumbing connection to the street would have required extensive additional work and significantly increased the homeowner's costs.
Rather than proceeding with a complete replacement, CoreFrame Builders helped identify an alternative solution that involved sleeving the existing pipes. This approach allowed the necessary plumbing connections to be addressed without rebuilding the entire line to the street, helping reduce unnecessary construction and additional expense.
The project also experienced challenges during the inspection process. Although drawings had already been permitted, inspection requirements resulted in multiple revisions and interruptions throughout construction. CoreFrame Builders continued coordinating the required changes and inspections to keep the project progressing toward completion.


Materials & Construction
The project combined new residential construction with plumbing improvements and supporting spaces designed to increase the property's overall functionality.
Construction included:
- New 800-square-foot ADU
- Attached storage space
- New pool house restroom
- Plumbing connections and improvements
- Existing pipe sleeving
- Interior construction and finishing
- Required drawing revisions and construction coordination
Particular attention was given to integrating the new ADU with the property's existing infrastructure while developing practical solutions to the conditions discovered during construction.
The Finished Result
The completed Whittier project delivered an approximately 800-square-foot ADU, an attached storage room, and a new restroom serving the existing pool house. Together, these improvements expanded the property's usable space while adding greater convenience and functionality for the homeowners.
Despite unexpected plumbing conditions and a demanding inspection process that required multiple revisions, CoreFrame Builders
successfully navigated the project's primary challenges. By identifying an alternative solution for the damaged plumbing rather than pursuing a costly full replacement to the street, the team helped control additional costs while moving the project toward a successful completion.
GET IN TOUCH WITH US
Looking to Build an ADU in Whittier?
Whether you're planning an ADU, expanding an existing property, or navigating challenging site and infrastructure conditions, CoreFrame Builders can help guide your project from planning through construction. Our team combines practical problem-solving, transparent communication, organized project management, and quality craftsmanship to create residential spaces designed around your property's needs and long-term goals.